
09/01/2014
00-17
S-7S FUSELAGE – FINAL ASSEMBLY
Refer to Section 1 and complete the following items:
•
MAIN GEAR ASSEMBLY AND INSTALLATION
o
FINAL INSTALLATION
•
GEAR LEG FAIRING ASSEMBLY AND INSTALLATION
o
FAIRING FIT UP
o
INSTALLATION
•
TAIL WHEEL ASSEMBLY AND INSTALLATION
Refer to Section 2 and complete the following items:
•
CONTROL STICK ASSEMBLY AND INSTALLATION
o
TORQUE TUBE FIT UP
o
FINAL ASSEMBLY AND INSTALLATION
•
ELEVATOR PUSH PULL TUBE ASSEMBLY
Refer to flow plan section
TAIL SURFACES FINAL ASSEMBLY AND INSTALLATION
•
Complete all items listed.
Refer to Section 2 and complete the following items:
•
FLAP LEVER ASSEMBLY AND INSTALLATION
Refer to Section 6 and complete the following items:
•
BOOT COWL AND INSTRUMENT PANEL INSTALLATION
o
BOOT COWL AND INSTRUMENT PANEL FIT UP
Refer to Section 1 and complete the following items:
•
FLOORBOARD INSTALLATION
o
INSTALLATION
•
RUDDER PEDAL INSTALLATION
•
FIREWALL ASSEMBLY AND INSTALLATION
o
ASSEMBLY
o
INSTALLATION
•
HYDRAULIC BRAKE INSTALLATION
AFTER COVERING AND PAINT OF FUSELAGE
•
RUDDER SYSTEM ASSEMBLY AND INSTALLATION
o
FINAL INSTALLATION
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......