
09/01/2014
02E-01
S-7S THROTTLE LEVER INSTALLATION
(AFTER COVERING AND PAINT OF FUSELAGE)
1.
Assemble the forward throttle lever to the throttle cable guide as shown in
the parts drawing. Refer to
FIGURE 02E-01
.
2.
Assemble the throttle lever knobs to each lever. Refer to the parts
drawing and
FIGURE 02E-01
.
3.
Press Flange Bushings into Throttle Levers and cable guide.
4.
Locate the throttle lever mount lugs on the left side of the fuselage. Clean
off any paint that may have accumulated and apply a light film of grease
on the lugs.
5.
Temporarily slide the lever assemblies onto their respective mount lugs.
Check for free movement. Lightly sand the mount lugs if required. Remove
lever assemblies from lugs.
6.
Install the first set of washers as shown in the parts drawing. Refer back to
FIGURE 02E-01
.
7.
Slide the throttle lever assemblies onto their respective lugs. The lever
assemblies should rotate freely without excessive play. Note the proper
orientation of each lever.
8.
Slide the second set of washers onto the lugs.
9.
Install and tighten the retaining nuts and check for play within each set of
levers. The levers should feel solid and snug and rotate with just slight
resistance. If any play or looseness exists, additional plastic washers may
be added to achieve the correct adjustment.
10.
Install the throttle linkage tube as shown in the parts drawing.
IMPORTANT: Note the orientation of the linkage tube in respect to the
lever assemblies, as well as the orientation of each bolt.
Operate both
throttle levers and check for smoothness.
11.
Install the spacer, washers and friction knob through the slots in the
forward throttle lever as shown in the parts drawing and
FIGURE 02E-11
.
It may be necessary to trim some of the length off the friction knob
threads. Add or delete 3/16" washers as necessary for proper adjustment.
12.
Slide the throttle cable housing retention block on the cable-housing stub
located just down and forward of the forward throttle lever.
13.
Center retention block on the pre-drilled holes in the stub. Transfer drill
through the stub and through the retention block centerline. See
FIGURE
02E-13
.
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......