09/01/2014
02E-02
14.
Remove the retention block and mark the two holes on the topside of the
block as per
FIGURE 02E-13
.
15.
Drill completely through the throttle retention block from top to bottom with
a #40 drill bit. Drill only the top half of the retention block to #30.The
machine screw will self-tap into the bottom.
16.
The forward downward facing
holes in the cable-housing stub are drilled
#11 to accept the cable housing.
IMPORTANT: The holes in the upper aft
side of the stub must remain #40.
Slide the retention block onto the stub
so that the open end of the block is pointing forward.
For installation of throttle cables refer to the engine section.
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......