
03/16/07
06F-02
Install top and bottom cowls to the aircraft. Center the cowling at spinner backing
plate. Cowling must rest firmly against 3/8” spacer. Tape both halves securely
together. Check fit. If satisfied mark the bottom and top cowling around the rear
edge at the hole locations of the receptacles located at the boot cowl joggle. Use
a hole finder or measure back wards along a reference line starting at the center
of the hole. Step drill top and bottom cowl at the marked locations to ¼”.
Layout the hole pattern on the top cowl as shown in
FIGURE 06-18
and pre drill
to #30.
Install top and bottom cowling. Secure with ¼ turn studs temporarily to the boot
cowl and tape both half’s securely together. Transfer drill through the #30 holes
in the top cowl into the bottom cowl. Cleco as you go.
Drill out to # 11 and cleco as you go.
Remove both cowlings and cleco the quarter turn receptacles to the bottom cowl.
Using a #40 drill bit, drill both mount holes for the receptacles.
Remove the receptacles and drill the quarter turn holes on the bottom cowl out to
5/16". Countersink the #40 rivet holes to allow the rivet heads to sit flush. Install
the quarter turn receptacles. Drill the quarter turn holes in the top cowling out to
¼". See
FIGURE 06-18
.
Test - mount the cowling assembly to the aircraft to assure fit.
Final trim the air inlets in the front of top and bottom cowling. Use the template
provided in
FIGURE 06-20
for final sizing. The template should slide through the
opening.
Temporarily mount the oil check door assembly to the top cowl. Use clecos to
hold the assembly to the cowl and together. Check fit, function and disassemble.
Apply the surface finish to all cowling parts.
INSTALLATION
Refer to
FIGURE 06-18
Install the oil check door assembly to the top cowling as per parts manual.
Install the ¼ turn fasteners to the top cowling as per parts manual and
FIGURE
06-18
.
NOTE: The length of the ¼ turn studs depends on the thickness of the
fiberglass. Some variation is possible. Therefore three different lengths of studs
are provided. Use as required.
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......