09/01/2014
01A-01
S-7S MAIN GEAR ASSEMBLY AND INSTALLATION
MAIN GEAR FIT UP
NOTE: Please be sure to refer to parts page when installing. Fuselage should be
covered and painted before final installation.
1.
Become familiar with the Main Gear Installation Parts Drawings and collect the
parts shown in the drawing.
2.
Examine your Gear Legs. They are glass beaded to relieve stresses from
machining and bending. If your inspection reveals any gouges or scratches,
polish or sand to remove.
3.
Support the fuselage on sturdy sawhorses
4.
Install the landing gear using the hardware shown in the Parts Drawings.
5.
Top Main Gear Clamp Plate should be orientated per
FIGURE 01A-05
. Be sure
the Top Main Gear Clamp Plate fits tight against the Fuselage Longeron. File
upper side of clamp plate if required.
6.
If any movement is evident where the Clamp Plates intersect the Gear Legs, use
a file to remove material from the Landing Gear Spacer Bushings until the
movement is eliminated.
IMPORTANT: Be sure to install Anti-chafe Strip
between Gear Leg and Bottom Clamp Plate.
7.
It is recommended to paint the Gear Legs and Clamp Plates.
8.
Final install Gear Legs after covering and painting Fuselage.
IMPORTANT
TORQUE MAIN GEAR MOUNTING BOLTS TO THE FOLLOWING:
AN5 = 140 INCH-POUNDS
AN6 = 190 INCH-POUNDS
!!! CAUTION !!!
Do
NOT
Powder Coat or Heat-Treat Gear Legs.
Doing so may remove required temper and strength.
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......