09/01/2014
07C-02
4.
Position the fuselage bottom side up.
5.
Roll out and cut a piece of fabric long enough to cover the bottom of the
fuselage. Slide the fabric to one side of the fuselage and trim off the
excess material. Leave approximately 5" of material on all sides.
6.
Secure the fabric to the longerons using cloth pins.
7.
Bond one side of the fabric to the bottom longeron from station 2 to station
IMPORTANT: Apply adhesive to the longeron in the bond area only to
prevent dips or puckers in the fabric.
See
FIGURE 07C-07
.
8.
Bond the opposite side to the bottom longeron.
9.
Bond the fabric at station 2 around the bottom cross tube.
10.
Wrap and glue all fabric to the interior side of the fuselage and trim. See
FIGURE 07C-07
.
11.
Let dry and iron out all wrinkles and puckers along the bond area. Pre-iron
the surface only enough to take wrinkles out.
12.
Position the fuselage so the left side is up.
IMPORTANT: Do NOT cover
right side first, it will make trimming excess fabric off the battery door
opening harder to do!
13.
Roll out and cut the fabric to length. The fabric panel has to cover the
entire left side from the bottom to the vertical stabilizer former (top center
of fuselage) including the left side of the vertical stabilizer. Trim off the
excess fabric.
14.
Bond the fabric to the bottom Longeron. Trim the fabric as shown in
FIGURE 07C-07
. Cover over the battery access door opening. Special
instructions will follow on how to finish this area.
15.
Bond the remaining perimeter of the fabric around the forward fuselage
tubes, the vertical stabilizer former, the vertical stabilizer - leading edge, -
top and – trailing edge spar.
16.
Trim excess fabric off.
17.
Let dry and iron out all wrinkles in the bond area.
18.
Cut the fabric in the battery access door as shown in
FIGURE 07C-18
and
glue flaps to edges of the door opening.
19.
Pre-tension the fabric, only enough to remove bagginess.
20.
CAUTION: Use care when pre-tensioning, it is possible to pull the vertical
stabilizer and top stringer out of alignment.
21.
Rotate the fuselage to the opposite side and cover following the same
procedure. When covering the second side of the fuselage it will be
necessary to use a 1-1/2” flat lap joint along the vertical stabilizer stringer
from station 3 to station 7.
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......