11/19/02
07G-01
DOORS
1.
Clean the entire frame thoroughly.
2.
Perform pre-covering check using the following items.
Door frames primed
NOTE: Both sides of the lower doorframes are covered with a separate piece of
fabric.
3.
Cut fabric large enough to fit the frame and with enough excess to allow
gluing around the frame tubes all the way around.
4.
It does not matter which side you apply first.
NOTE: It is recommended to
apply the fabric to the inside first. That will make a smoother finish on the
outside.
5.
Glue fabric (first side) all the way around the frame tubes. The fabric
should be glued to 3 sides of the square frame tubes. You have to cut the
fabric in the corners.
6.
Let dry and iron all fabric edges down.
7.
Pre-iron the fabric surface only enough to take wrinkles out.
8.
Glue fabric (second side) all the way around the frame tubes. Again, it is
recommended to glue the fabric to 3 sides of the square frame tubes.
9.
Let dry and pre-iron the surface only enough to take wrinkles out.
10.
Let dry and final iron entire surface for tightening of fabric.
11.
Patch and tape in order as per
FIGURE 07G-11
.
12.
Iron along tapes and iron down tape edges.
13.
The doors are now ready for primer and paint.
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......