09/01/2014
00-15
S-7S ASSEMBLY FLOW CHART – DETAILED
Note:
The headings in the detailed flow charts on the following pages refer to text
manual headings.
S-7S FUSELAGE – PRE-COVERING ASSEMBLY
Refer to Section 1 and complete the following items:
•
RUDDER SYSTEM ASSEMBLY AND INSTALLATION
o
RUDDER FIT UP
•
PREP AND PRIME FUSELAGE FRAME AND RUDDER FRAME
•
FUSELAGE FORMER INSTALLATION
o
VERTICAL STABILIZER FORMER
o
FUSELAGE SIDE FORMER
o
FUSELAGE BOTTOM FORMER
o
RIB VERTICAL STABILIZER
•
MAIN GEAR ASSEMBLY AND INSTALLATION
o
MAIN GEAR FIT UP
•
FLOORBOARD INSTALLATION
o
FIT UP
•
RUDDER SYSTEM ASSEMBLY AND INSTALLATION
o
PRE-COVERING ASSEMBLY
•
DOORFRAME BATTERY ACCESS PANEL INSTALLATION
Refer to Section 4 and complete the following items:
•
BATTERY BOX ASSEMBLY AND INSTALLATION
o
BATTERY BOX AND GROUND CABLE
•
ELT AND COMMUNICATION ANTENNA INSTALLATION
o
ANTENNA MOUNT PLATES
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......