09/01/2014
07C-01
FUSELAGE
1.
Clean the entire frame thoroughly.
2.
Apply anti chafe tape around sharp edges of vertical stabilizer rib
(masking tape).
3.
Perform pre-covering check using the following items.
Vertical stabilizer former installed
Lower aft side former installed
Center aft side former installed
Upper aft side former installed
Bottom former installed
Rib vertical stabilizer installed
Floorboards fit and drilled (remove floorboard after drilling)
Floorboard attach tabs received nut plates
Rudder pedal attach tabs received nut plates
Rudder pulleys at station 7 installed
Rudder cable guides at station 5 installed
Rudder cables routed through pulleys at station 7 (placed in plastic
bag)
Battery box assembled and installed
Battery ground cable installed
Battery cable installed (zip tie to frame and bag at station 3)
Seat belt attach tabs drilled to 1/4”
Aft shoulder belt mount bolt installed
ELT antenna mount plate installed
Communication antenna mount plate installed
ELT mount tray installed
Battery access door frame installed
Baggage compartment fit-up and removed
Anti-Chafe tape applied around sharp edges of vertical stab rib
Elevator trim servo wire in place
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......