11/10/08
10B-05
7 Right wing- Trailing Edge
(1)
Aileron – CHECK freedom of movement and security
(2)
Flap – CHECK security
(3)
Rear strut and jury strut attach – CHECK security, dents, nicks
(4)
Fabric (Surface) - CHECK - for rips, tears, damage
BEFORE STARTING THE POWERPLANT
(1)
Preflight Inspection - COMPLETE.
(2)
Passenger Briefing - COMPLETE.
(3)
Seat, seat belts - ADJUST and LOCK.
(4)
Brakes - TEST and SET
(5)
Radio, Electrical Equipment - OFF
(6) Circuit Breakers - CHECK IN
(7) Fuel Selector Valve - ON.
STARTING THE POWERPLANT
COLD
START
(1)
Throttle - CLOSED.
(2)
Choke - ON.
(3)
Master Switch - ON.
(4)
Propeller Area - CLEAR
(5)
Ignition Switch - START (release when engine starts).
(6)
Throttle adjust – IDLE smooth – up to 2000 RPM
(7)
Oil pressure - CHECK
(8)
Choke – OFF
(9)
Avionics master - ON.
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......