English
30
Step 8:
Turn to the “ON” position Main Power Switch and Chiller Pump Circuit Breaker (all other Circuit Breakers should stay in
the “OFF” position).
Check correct rotation of the Chiller Pump
Please note:
there is an arrow located at the back part of the pump for direction
indication. Reverse two phases R-S-T on the terminal board in case of incorrect rotation.
CAUTION:
The pump must not flat running or in inverse direction; therefore the checking of the correct rotation
must be quick
Step 9:
Let Chiller Pump running for Minimum 20 minutes in order to allow the purging of all residual air within Hydraulic
Circuit.
Stop Chiller Pump and check Pre-Charge Pressure.
Refill if necessary.
Step 10:
Turn to the ON position all Circuit Breakers.
The Chiller Unit is now ready to operate
CAUTION
: Additional Air purge valves into external hydraulic circuit may be required should the Chiller be
installed on a low level (thus Air purge valve 3 not being at the highest point of the entire hydraulic system)
Please note
CLOSE LOOP
Chillers are provided with a Safety Discharge Valve (component 2 within
Picture 26
above)
set at 4 bar
(87 PSI) .
Max Operating Hydraulic Pressure value (PS) on Chiller type label has to be considered in addition to the pre-charge
pressure.
Regurarly check hydraulic system pre-charge pressure and refill if necessary.
Содержание EB 130 WT
Страница 20: ...English 20 APPENDIX A1...
Страница 21: ...English 21 APPENDIX A2...
Страница 26: ...English 26 Max pressure valve Thermostatic Valve Evaporator Refrigerant pipes Fan Pump...
Страница 54: ...Deutsch 54 ANLAGE A1...
Страница 56: ...Deutsch 56 ANLAGE A2...
Страница 62: ...Deutsch 62 H chstdruckventil Thermostatisches Ventil Verdampfer K hlmittelrohre L fter Pumpe...
Страница 89: ...Italiano 89 ALLEGATO A1...
Страница 91: ...Italiano 91 ALLEGATO A2...
Страница 97: ...Italiano 97 Valvola massima pressione Valvola termostatica Evaporatore Tubi del refrigerante Ventilatore Pompa...
Страница 124: ...Espa ol 124 ANEXO A1...
Страница 126: ...Espa ol 126 ANEXO A2...
Страница 132: ...Espa ol 132 V lvula de m xima presi n V lvula termost tica Evaporador Tubos del refrigerante Ventilador Bomba...
Страница 159: ...Fran ais 159 ANNEXE A1...
Страница 161: ...Fran ais 161 ANNEXE A2...
Страница 167: ...Fran ais 167 Vanne pression maximum Vanne thermostatique vaporateur Tuyaux du r frig rant Ventilateur Pompe...
Страница 177: ...177 1 2 3 4 5 6 7 8 8 1 9 10 11 12 A1 A2 B1 B2 C 1 2 D 1 12 2 EN 60204...
Страница 178: ...178 30 435 PSI 5 8 85 PSI PWW PS 12...
Страница 182: ...182 4 7 3...
Страница 183: ...183 3 b PWW 3 4 PWW 9000 12000 1 PWW 18000 24000 3 4 PWW 9000 12000 1 PWW 18000 24000 4...
Страница 187: ...187 60 90 m PFANNENBERG 18 15 ISO 4406 10 40 C 45 C 50 C 15 C PFANNENBERG 0 C 11 A1 A2 PWW A2...
Страница 188: ...188 0 9 Maintain professional washer LI FUCHS Pfannenberg 46783000135 25 10 2 Professional Washer 98 7 8 10...
Страница 189: ...189 11 12 13 14...
Страница 190: ...190 l R S T 15 16 17...
Страница 191: ...191 5 R S T 18 19 20 21...
Страница 192: ...192 PFANNENBERG...
Страница 193: ...193 12 KLIXON 2 1 Klixon...
Страница 194: ...194 40 C...
Страница 195: ...195...
Страница 196: ...196 A1...
Страница 198: ...198 A2...
Страница 200: ...200 B1 n 842 2006 2 PWW 22 23...
Страница 201: ...201 A2 20 30 5 7 11 24 25...
Страница 202: ...202 24 36 25 309 1 2004...
Страница 203: ...203 B2 EB EB150 T EB190 WT...
Страница 204: ...204...
Страница 205: ...205 C 1 Pfannenberg PFANNENBERG 1 2 3 26 2 1 0...
Страница 210: ...210 2 PWW INLET 2 1 31 PWW Air purge valve Max safety valve Refill valve...
Страница 211: ...211 D 1 1 1 90 m pH 1 2 3 4 32...
Страница 212: ...212 N 19 05 2014 01 _ FAr 01 09 2014 01 A Far 17 12 2014 01 B PWW FAr AGe 11 11 2015 01 C VSa 15 12 17 01 D vlv ACi...