English
23
If the chiller is equipped with an air filter, the filter has to be changed/cleaned monthly, or, if required in a shorter time
interval
Inspect the condenser monthly on the external side to see if it is clean.
The fins of the condenser must not have any dust
deposits or residual products or sludges on their surface .
The condenser must be cleaned in monthly intervals, or, if required in shorter time intervals.
If the Chiller is equipped with a filter on the hydraulical side (filter to be installed in the inlet of the chiller), the filter has to be
checked/cleaned monthly, or if required, in a shorter time interval
It’s recommended to change the water glycole mixture 20% every year (every 2 years if it’s a 30 % glycole mixture) to allow
the operation of the unit in the best conditions.
Longer standstill of the chiller requires draining of the tank and complete water circuit. Open the ball valve at the end of the
draining hose to drain the circuit. When the drain operation is finished close again the ball valve, otherwise when you refill
again the circuit water will automatically darined again from the hose.
For a new installation, it is recommended to empty the hydraulic circuit. Please, refer to chapter
4
for the lifting of the unit
and chapters
7
and
11
for connection and start up.
It is recommended to check safety discharge valve every 24/36 months. Leakages and/or visible scale may suggest
potential malfunction.
Please note: it is necessary to replace safety discharge valve after its intervention. Safety discharge pressure set is not
guaranteed after first intervention
Refrigeration circuit is subjected to high stationary and operating pressures.
Air filter
Picture 24
– Air filter
placement
Picture 25
– Condenser external surface
Содержание EB 130 WT
Страница 20: ...English 20 APPENDIX A1...
Страница 21: ...English 21 APPENDIX A2...
Страница 26: ...English 26 Max pressure valve Thermostatic Valve Evaporator Refrigerant pipes Fan Pump...
Страница 54: ...Deutsch 54 ANLAGE A1...
Страница 56: ...Deutsch 56 ANLAGE A2...
Страница 62: ...Deutsch 62 H chstdruckventil Thermostatisches Ventil Verdampfer K hlmittelrohre L fter Pumpe...
Страница 89: ...Italiano 89 ALLEGATO A1...
Страница 91: ...Italiano 91 ALLEGATO A2...
Страница 97: ...Italiano 97 Valvola massima pressione Valvola termostatica Evaporatore Tubi del refrigerante Ventilatore Pompa...
Страница 124: ...Espa ol 124 ANEXO A1...
Страница 126: ...Espa ol 126 ANEXO A2...
Страница 132: ...Espa ol 132 V lvula de m xima presi n V lvula termost tica Evaporador Tubos del refrigerante Ventilador Bomba...
Страница 159: ...Fran ais 159 ANNEXE A1...
Страница 161: ...Fran ais 161 ANNEXE A2...
Страница 167: ...Fran ais 167 Vanne pression maximum Vanne thermostatique vaporateur Tuyaux du r frig rant Ventilateur Pompe...
Страница 177: ...177 1 2 3 4 5 6 7 8 8 1 9 10 11 12 A1 A2 B1 B2 C 1 2 D 1 12 2 EN 60204...
Страница 178: ...178 30 435 PSI 5 8 85 PSI PWW PS 12...
Страница 182: ...182 4 7 3...
Страница 183: ...183 3 b PWW 3 4 PWW 9000 12000 1 PWW 18000 24000 3 4 PWW 9000 12000 1 PWW 18000 24000 4...
Страница 187: ...187 60 90 m PFANNENBERG 18 15 ISO 4406 10 40 C 45 C 50 C 15 C PFANNENBERG 0 C 11 A1 A2 PWW A2...
Страница 188: ...188 0 9 Maintain professional washer LI FUCHS Pfannenberg 46783000135 25 10 2 Professional Washer 98 7 8 10...
Страница 189: ...189 11 12 13 14...
Страница 190: ...190 l R S T 15 16 17...
Страница 191: ...191 5 R S T 18 19 20 21...
Страница 192: ...192 PFANNENBERG...
Страница 193: ...193 12 KLIXON 2 1 Klixon...
Страница 194: ...194 40 C...
Страница 195: ...195...
Страница 196: ...196 A1...
Страница 198: ...198 A2...
Страница 200: ...200 B1 n 842 2006 2 PWW 22 23...
Страница 201: ...201 A2 20 30 5 7 11 24 25...
Страница 202: ...202 24 36 25 309 1 2004...
Страница 203: ...203 B2 EB EB150 T EB190 WT...
Страница 204: ...204...
Страница 205: ...205 C 1 Pfannenberg PFANNENBERG 1 2 3 26 2 1 0...
Страница 210: ...210 2 PWW INLET 2 1 31 PWW Air purge valve Max safety valve Refill valve...
Страница 211: ...211 D 1 1 1 90 m pH 1 2 3 4 32...
Страница 212: ...212 N 19 05 2014 01 _ FAr 01 09 2014 01 A Far 17 12 2014 01 B PWW FAr AGe 11 11 2015 01 C VSa 15 12 17 01 D vlv ACi...