Close Loop Chiller Start-up
2
Water - water Chiller Start-up
1. Warranty
This warranty covers the material design and quality during the first 12 months starting from the delivery date. Within this
defined period our Company will either repair, or replace (with ex works delivery) all parts which on the sole opinion of the
supplier, have caused quality problems which are not a result of poor maintenance, inexperience of the operators, faulty
installation or failures which are caused because this instruction was not followed. This warranty does not include the expenses,
travel hours and travel allowance related to our technicians in case their presence is required at the customer's factory. Th ese
expenses will be totally invoiced as working hours. The customer shall not have the right to claim any refund from our Company
for the time during which the machine shall remain inactive, related to repairs. No refund will be acknowledged for expenses,
damages, either direct or indirect, which are a result of the above.
Separate agreements with customers have to be agreed in written form may vary from this paragraph.
2. Safety
The Chiller
instructions must be read by the installer and personnel in charge for operation, before starting the chiller.
All safety and security instructions given in this manual have to be observed!
Only qualified personnel are allowed to install, operate and do the maintenance work.
Non observance of the instructions may cause injuries and will cancel the manufacturers liability for subsequent damage.
National regulations on accident prevention, regulations of the local power supply authorities as well as any specific safety
instructions for chiller must be observed.
The safety of the unit is only guaranteed, if it is used as intended.
The following points must be observed before commissioning and while operating the Chiller:
Familiarize yourself with all operating controls.
Make sure that all working limits indicated within unit label are observed.
Use protective devices to check electrical insulation. Do not carry out any work on any part of the equipment that might
be live with wet clothing, hands and feet.
Never spill or pour any cooling medium into the environment as this may cause health hazard.
The components of the Chiller must not be modified in any way.
Disconnect the power supply and release pressure from any pressurized component before carrying out any service
work on the Chiller.
A qualified commissioning engineer must ensure that the Chiller has been connected to the electrical mains in
accordance with the standard EN 60204 and all other applicable national regulations.
Содержание EB 130 WT
Страница 20: ...English 20 APPENDIX A1...
Страница 21: ...English 21 APPENDIX A2...
Страница 26: ...English 26 Max pressure valve Thermostatic Valve Evaporator Refrigerant pipes Fan Pump...
Страница 54: ...Deutsch 54 ANLAGE A1...
Страница 56: ...Deutsch 56 ANLAGE A2...
Страница 62: ...Deutsch 62 H chstdruckventil Thermostatisches Ventil Verdampfer K hlmittelrohre L fter Pumpe...
Страница 89: ...Italiano 89 ALLEGATO A1...
Страница 91: ...Italiano 91 ALLEGATO A2...
Страница 97: ...Italiano 97 Valvola massima pressione Valvola termostatica Evaporatore Tubi del refrigerante Ventilatore Pompa...
Страница 124: ...Espa ol 124 ANEXO A1...
Страница 126: ...Espa ol 126 ANEXO A2...
Страница 132: ...Espa ol 132 V lvula de m xima presi n V lvula termost tica Evaporador Tubos del refrigerante Ventilador Bomba...
Страница 159: ...Fran ais 159 ANNEXE A1...
Страница 161: ...Fran ais 161 ANNEXE A2...
Страница 167: ...Fran ais 167 Vanne pression maximum Vanne thermostatique vaporateur Tuyaux du r frig rant Ventilateur Pompe...
Страница 177: ...177 1 2 3 4 5 6 7 8 8 1 9 10 11 12 A1 A2 B1 B2 C 1 2 D 1 12 2 EN 60204...
Страница 178: ...178 30 435 PSI 5 8 85 PSI PWW PS 12...
Страница 182: ...182 4 7 3...
Страница 183: ...183 3 b PWW 3 4 PWW 9000 12000 1 PWW 18000 24000 3 4 PWW 9000 12000 1 PWW 18000 24000 4...
Страница 187: ...187 60 90 m PFANNENBERG 18 15 ISO 4406 10 40 C 45 C 50 C 15 C PFANNENBERG 0 C 11 A1 A2 PWW A2...
Страница 188: ...188 0 9 Maintain professional washer LI FUCHS Pfannenberg 46783000135 25 10 2 Professional Washer 98 7 8 10...
Страница 189: ...189 11 12 13 14...
Страница 190: ...190 l R S T 15 16 17...
Страница 191: ...191 5 R S T 18 19 20 21...
Страница 192: ...192 PFANNENBERG...
Страница 193: ...193 12 KLIXON 2 1 Klixon...
Страница 194: ...194 40 C...
Страница 195: ...195...
Страница 196: ...196 A1...
Страница 198: ...198 A2...
Страница 200: ...200 B1 n 842 2006 2 PWW 22 23...
Страница 201: ...201 A2 20 30 5 7 11 24 25...
Страница 202: ...202 24 36 25 309 1 2004...
Страница 203: ...203 B2 EB EB150 T EB190 WT...
Страница 204: ...204...
Страница 205: ...205 C 1 Pfannenberg PFANNENBERG 1 2 3 26 2 1 0...
Страница 210: ...210 2 PWW INLET 2 1 31 PWW Air purge valve Max safety valve Refill valve...
Страница 211: ...211 D 1 1 1 90 m pH 1 2 3 4 32...
Страница 212: ...212 N 19 05 2014 01 _ FAr 01 09 2014 01 A Far 17 12 2014 01 B PWW FAr AGe 11 11 2015 01 C VSa 15 12 17 01 D vlv ACi...