User
Manual
Bed
‐
GK
1+2e
Rev.
03.04.2019
Page
110
/
143
Start
decoder
check:
This
test
checks
the
function
of
the
decoder.
First
the
decoder
line
is
initialised.
Then
the
pump
decoder
is
started.
30
seconds
after
the
pump
decoder
has
been
activated
the
current
consumption
of
the
decoder
line
is
measured.
This
value
is
then
used
as
a
reference
value
and
is
recorded
in
the
decoder
current
(A)
field.
Now
the
decoders
marked
for
the
test
will
be
activated
one
after
the
other.
30
seconds
after
a
decoder
has
been
activated
the
current
consumption
of
the
decoder
line
is
measured
and
compared
with
the
reference
value.
The
difference
is
recorded
in
the
decoder
current
(A)
field.
Should
the
value
displayed
be
equal
to
0,000
the
decoder
must
be
checked
on
the
spot.
Start
decoder/valve
check:
Same
as
the
decoder
check
but
including
an
additional
flow
paddle
(S3)
check.
test
result:
After
the
test
has
finished
you
can
out
all
test
results.
13.5
Transmitter
Download
To
facilitate
this
transmitter
must
be
connected
to
the
field
connector.
Start
the
Greenkeeper
software
and
enter
a
password
for
Level
3
.
Click
the
[Service
/
Transmitter
download]
menu.
Содержание Greenkeeper Feedback
Страница 13: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 13 143 Left mouse click at System and device manager...
Страница 54: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 54 143 7 9 Wiring Schematic for VCU...
Страница 123: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 123 143 VCU...
Страница 134: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 134 143 15 1 5 FB Decoder Indication Light...
Страница 136: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 136 143...
Страница 141: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 141 143...