User
Manual
Bed
‐
GK
1+2e
Rev.
03.04.2019
Page
10
/
143
3.
Hardware
Installation
3.1
On
‐
site
preparations
for
the
installation
of
the
Valve
Control
Unit
(VCU)
A
“Schuko”
socket
is
needed
for
the
power
supply.
Disconnect
the
green
‐
yellow
earth
conductor
from
the
socket.
Grounding
will
be
facilitated
via
the
VCU.
Plug
the
supplied
surge
protector
in
the
socket.
Mount
the
Valve
Control
Unit
(VCU)
to
its
location
on
the
wall.
Connect
the
available
decoder
cable
to
terminal
34/35.
If
you
need
to
run
multiple
decoder
cables
(up
to
3
units)
use
terminals
36/37
and
38/39
next.
(See
also
User
Manual
Page
chapter10,
Wiring
schematic)
Connect
the
external
interfaces
such
as
Rain
gauge
Type
Mini
Click
to
their
corresponding
terminals.
IMPORTANT:
Please
check
the
VCU
version
on
the
inside
and
outside
label
on
the
door!!
If
it
does
not
show
Greenkeeper
Win,
follow
the
instructions
for
a
chipset
update.
Without
the
new
chipset
the
VCU
is
not
compatible
with
Greenkeeper
Win.
Grounding
with
an
earth
conductor
to
BA
10119.
An
earth
conductor
at
least
20
m
long
shall
be
buried
in
a
ditch
at
least
70
cm
deep,
in
accordance
with
BA
10119.
The
earth
resistance
should
be
less
than
10
Ohm.
In
poor
conductivity
areas
(gravel
or
sand)
2
x
20
m
earth
conductors
should
be
used.
Mount
a
potential
equalizing
bar
on
a
wall
inside
the
building.
Connect
the
earth
conductor
to
the
equalizing
bar.
The
potential
equalizing
bar
is
connected
to
the
VCU
with
a
(green
‐
yellow)
earth
cable
1
x
16
mm².
The
earth
cable
connects
the
earth
bar
of
the
VCU
to
the
potential
equalizing
bar.
Order
number
for
the
grounding
equipment:
SB50001.
On
the
right
‐
hand
side
of
the
VCU
you
will
find
2
“Schuko”
sockets.
Plug
the
cord
of
your
computer
into
one
of
the
sockets.
Should
your
monitor
use
a
separate
“Schuko”
plug
use
the
second
socket
for
this.
For
the
modem
you
can
use
any
socket
that
you
choose.
Now
plug
the
VCU
mains
cord
in
the
mains
surge
suppression
unit
connected
to
the
mains
outlet.
Connect
the
VCU
to
the
COM
1
serial
port
of
your
computer.
Should
there
be
two
identical
sockets
on
your
computer,
use
the
one
marked
Port
1,
COM
1,
Ser.
1
,
A
or
similar.
Now
switch
on
the
power
supply.
The
VCU
will
acknowledge
this
by
emitting
a
tone
signal.
The
green
LED
on
the
VCU
is
lit
up
continuously
.
The
yellow
LED
flashes
(with
long
intervals
between
the
flashes).
Should
the
yellow
LED
not
flash,
there
is
no
software
downloaded
in
the
VCU.
Содержание Greenkeeper Feedback
Страница 13: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 13 143 Left mouse click at System and device manager...
Страница 54: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 54 143 7 9 Wiring Schematic for VCU...
Страница 123: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 123 143 VCU...
Страница 134: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 134 143 15 1 5 FB Decoder Indication Light...
Страница 136: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 136 143...
Страница 141: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 141 143...