User
Manual
Bed
‐
GK
1+2e
Rev.
03.04.2019
Page
72
/
143
All
valves,
whose
name
begins
with
G01,
will
have
the
same
precipitation
value.
During
installation,
select
the
valve
names
so
that
the
first
letter
designates
the
area
that
will
be
irrigated.
G01
‐
1
G
reen
1
Sprinkler
1
G01
‐
2
G
reen
1
Sprinkler
2
etc.
8.1.2
Program
Test
The
program
test
feature
is
a
tool
for
checking
program
configurations.
Click
Program
test.
A
program
configuration
that
you
created
will
be
checked
and
made
ready
for
a
download
to
the
VCU.
Without
going
through
the
test
a
program
cannot
be
downloaded
to
the
VCU
and
therefore
cannot
be
used.
You
can
see
in
the
window
the
detailed
timing
of
the
program
operations
as
calculated
by
the
Flow
Manager.
This
is
how
the
program
will
be
executed
by
the
VCU.
By
clicking
the
button
you
can
the
program
data
to
have
an
overview
of
the
program
operation.
To
end
the
Program
test
click
OK.
You
will
return
to
the
Single
Valves
window.
Содержание Greenkeeper Feedback
Страница 13: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 13 143 Left mouse click at System and device manager...
Страница 54: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 54 143 7 9 Wiring Schematic for VCU...
Страница 123: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 123 143 VCU...
Страница 134: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 134 143 15 1 5 FB Decoder Indication Light...
Страница 136: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 136 143...
Страница 141: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 141 143...