User
Manual
Bed
‐
GK
1+2e
Rev.
03.04.2019
Page
69
/
143
8.1
Single
Valves
In
this
type
of
program
all
the
defined
single
valves
open,
taking
into
consideration
the
maximum
pump
capacity,
in
the
sequence
of
decoder
numbers
or
in
an
ascending
order
should
the
sequence
be
explicitly
entered.
The
Flow
Manager
provides
for
the
optimum
pump
loading.
Select
the
Single
valves
option
by
clicking
it
with
the
left
mouse
button.
To
create
a
new
program,
click
the
New
program
button.
8.1.1
Creating
a
New
Program
Type
the
new
program
name
in
the
field.
Give
your
new
program
a
unique
name.
The
maximum
length
is
8
alphanumeric
characters.
Confirm
the
entry
by
left
‐
clicking
the
OK
button.
Содержание Greenkeeper Feedback
Страница 13: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 13 143 Left mouse click at System and device manager...
Страница 54: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 54 143 7 9 Wiring Schematic for VCU...
Страница 123: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 123 143 VCU...
Страница 134: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 134 143 15 1 5 FB Decoder Indication Light...
Страница 136: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 136 143...
Страница 141: ...User Manual Bed GK 1 2e Rev 03 04 2019 Page 141 143...