
44.6
44b
44.1
44.2
97
Fig. C4.05
Fig. C4.05a
C4 Suspension on the Structure
5. Continue to relieve the crane lifting
gear and thereby position the
Climbing Rail in front of the bottom
Climbing Shoe (44b).
6. Close the guiding skids (44.2) of the
bottom Climbing Shoe and secure.
7. Tighten the Anchor Bolts (44.6) of
all Slab Shoes.
8. Raise climbing unit approx. 10 cm.
9. Activate the climbing pawls of the
bottom Slab Shoe and deactivate
the top Slab Shoe.
(Fig. C4.05 + C4.05a)
10. Completely relieve crane and release
crane lifting gear whilst standing in
a safe position.
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Содержание RCS P
Страница 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 169: ...169...