
37
37
98
98
39
39
39.1
39.1
110
40
40
40
40
40
79
C2 Assembly of the Working Platforms
Mounting the platform
decking and Toeboards
The decking must be tightly installed
and flush with the enclosure.
Install Toeboards on all leading edges.
Components
10
Crossbar RCS 103
11
Crossbar RCS 69
37
Working platform decking
(planks)
39
Toeboard
39.1
Angle Bracket 90°
40
Girder (timber)
98
TSS-Torx 6 x 80
110
Spax Screw TX25, 5 x 40
Assembly
1. Secure each individual plank (37),
2x per intersection with each Girder,
with Screws 6 x 80 (98).
2. Secure Angle Bracket 90° (39.1) to
the planking at a distance of approx.
100 cm using Screws 5 x 40 (110).
3. Mount Toeboards to Angle Bracket
90° using SPAX 5 x 25.
4. Fix Toeboards (39) to corners with
TSS Torx 6 x 60 (110).
Cantilevered planking or cut-to-size
decking made of multi-layer plywood
sheeting is to be secured against lifting.
Requirements for decking and Toe-
boards, see Section "B2 Planning of
the Units".
Fig. C2.02
Fig. C2.02
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Содержание RCS P
Страница 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 169: ...169...