
26
A4 Operating Sequence
Version 4
Climbing enclosure with straight
protection screen.
The slab formwork can remain in
position. The climbing enclosure
can climb past the slab formwork.
Example
Operating sequence with shortened
cycle times if two sets of SKYDECK
Slab Formwork are used.
Step 1
Climbing enclosure is in position.
Close cover flaps.
Concrete the columns.
Step 2
Erect slab formwork with stopends.
Install leading anchor with the aid of
the Slab Anchor Template.
Fig. A4.05
Fig. A4.06
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Содержание RCS P
Страница 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 169: ...169...