
24
121b
120
47
53
B
A
113
D1 Suspension and Anchoring
Anchoring position A:
Heavy-Duty Spindle in the climbing
position:
1. Remove fitting pin Ø 21 mm (24) in
the Spindle Shoe (121b) and store in
hole of the Climbing Rail.
2. Swivel down Heavy-Duty Spindle
(120) with Spindle Shoe.
Assembly on the anchoring:
3. Adjust the Heavy-Duty Spindle so
that the position of the hole in the
Spindle Shoe corresponds to the
anchoring (47).
4. Connect Spindle Shoe (121b) to the
anchoring using bolt M24 x 70 (53).
Have all bolts been secured with cotter
pins?
Climbing position B:
Heavy-Duty Spindle in the anchoring
position:
1. Remove bolts M24 x 70 (53) from
the anchoring (47).
2. Swivel up the Heavy-Duty Spindle
(120) with the Spindle Shoe.
3. Fix Spindle Shoe (121b) in the hole
Ø 26 of the Enclosure Post (1) using
fitting pins Ø 21.
(Fig. D1.10a)
Have all bolts been secured with cotter
pins?
Fig. D1.10a
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Содержание RCS P
Страница 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 169: ...169...