
44
48
51 / 52
48.1
44
48.1
48
49 / 53
< 30 mm
40
Fig. B1.19
Fig. B1.20
B1 Planning the Supporting Structure
Suspension with the Slab
Stopend Shoe
For installing a Slab Stopend Anchor
during the assembly of the Slab
Stopend Shoe.
Components
44
Climbing Shoe RCS
48
Stopend Slab Shoe RCS
48.1
Locking Pin 25 mm
Stopend Slab Anchor M30
Components
49
Bolt ISO 4017 M30 x 70-8.8
51
Stopend Slab Anchor M30/25-160
Alternatively:
Climbing Cone-2 M30/DW 20
Tie Rod DW 20 or B20
Threaded Anchor Plate DW 20
Stopend Slab Anchor M24
Components
53
Bolt ISO 4014 M24 x 70-10.9
50
Reducing Bushing Ø 30 - 25
52
Stopend Slab Anchor M24/20-128
Alternatively:
Climbing Cone-2 M24/DW 15
Tie Rod DW 15 or B15
Threaded Anchor Plate DW 15
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Содержание RCS P
Страница 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 169: ...169...