
47.5
47.7
47.9
119
Fig. D1.13c
Warning
During dismantling, anchoring compo-
nents may fall to the ground and hit
people below. This could lead to serious
injuries or even death.
⇒
Cordon off areas of risk under the
working areas.
⇒
In order to prevent personnel falling
out of the building, install anti-fall
protection with a dense mesh under-
neath, e.g. PROKIT.
Anchoring M24 Version 3
Climbing Cone-2 M24/DW 15
completely re-usable.
Components
47.5
Climbing Cone-2 M24/DW 15
47.7
Threaded Anchor Plate DW 15
Ø 80 mm
47.9
KK Concrete Cone M24
1. Loosen Climbing Cone (47.5) using a
Socket Wrench SW36 and screw out
approx. 1 cm.
2. Hammer the Cone downwards so
that the Threaded Anchor Plate DW
15 (47.7) is loosened.
3. Now completely remove the Cone.
Remove the Threaded Anchor Plate
together with Tie Rod DW 15 from
below using a secured mobile scaf-
fold.
4. Close remaining hole with suitable
KK Concrete Cone (47.9) and match-
ing adhesive.
(Fig. D1.13c)
D1 Suspension and Anchoring
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Содержание RCS P
Страница 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 169: ...169...