
7
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Introduction
Cleaning and Maintenance Instructions
In order to maintain the value and oper-
ational readiness over the long term,
clean the surface areas after every use.
The following points should help to
keep cleaning and maintenance costs
as low as possible.
For cleaning and maintenance of the
hydraulic system, observe the Instruc-
tions for Use for the RCS Climbing De-
vice and hydraulics.
Remove concrete residue with water
immediately after concreting; this
avoids any time-consuming and costly
cleaning operations.
Never clean powder-coated compo-
nents, e.g. elements and accessories,
with a steel brush or hard metal scrap-
er; this ensures that the powder-coat-
ing remains intact.
Mechanical components, e.g. spindles
or gear mechanisms, must be cleaned
of dirt or concrete residue before and
after use, and then greased with a suit-
able lubricant.
Provide suitable support for the com-
ponents during cleaning so that no un-
intentional change in their position is
possible.
Do not clean components suspended
on crane lifting gear.
Do not spray working platforms or ac-
cess ways with a concrete release
agent - slipping hazard!
Any repairs to PERI products are to be
carried out by qualified PERI personnel
only.
Содержание RCS P
Страница 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Страница 169: ...169...