C. Configuration Options
C-14
February 2001
3160-A2-GB21-90
Start At:
Next Clear N1 N2 N3 N4 N5 N6 N7 N8 N9 N10 N11 ...
N24 Prev
OR
Start At:
Next Clear D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 ...
D24 Prev
Data Port Channel Allocation (appears for the block and ACAMI methods only).
Designates the starting DS0 channel, N1–N24 for the network interface and D1–D24 for
the DTE Drop/Insert (DSX-1) interface.
Available selections are only those DS0 channels that provide enough bandwidth (based
on the configured data rate) to be used as a starting channel number.
Select the desired starting channel number by pressing the Function key under that
number. When you make the selection, the DSU/CSU allocates the correct amount of
DS0 channels to support the data rate currently configured for the port.
Clear – Deallocates all DS0 channels for this port from the network interface or the DTE
Drop/Insert (DSX-1) interface.
NOTE: This configuration option is not available if the individual channel allocation
method (Chan) is selected using the Assign By configuration option, or if Prt
n is
selected using the Assign To configuration option.
Table C-5.
Data Port Channel Configuration Options (3 of 4)
Содержание 3160-A3
Страница 16: ...About This Guide x February 2001 3160 A2 GB21 90...
Страница 24: ...1 Introduction 1 8 February 2001 3160 A2 GB21 90...
Страница 100: ...3 Operation 3 66 February 2001 3160 A2 GB21 90...
Страница 142: ...A Front Panel Menu A 2 February 2001 3160 A2 GB21 90...
Страница 198: ...C Configuration Options C 54 February 2001 3160 A2 GB21 90...
Страница 246: ...E SNMP MIB Objects E 32 February 2001 3160 A2 GB21 90...
Страница 280: ...H Asynchronous Terminal Operation H 24 February 2001 3160 A2 GB21 90...
Страница 282: ...I Equipment List I 2 February 2001 3160 A2 GB21 90...