3. Operation
3160-A2-GB21-90
February 2001
3-23
Selecting the Link Layer Protocol
Two link layer protocols, Point-to-Point Protocol (PPP) and Serial Line Internet
Protocol (SLIP), are supported for connection to an external SNMP manager,
Telnet device, or network device (e.g., a router). PPP can be used for synchronous
or asynchronous operation. SLIP can be used for asynchronous operation only.
NOTE:
The carrier-mounted DSU/CSU does not support synchronous operation on
the COM port.
The standalone DSU/CSU implementation of PPP supports the following:
Full negotiation of PPP’s Link Control Protocol (LCP).
Active negotiation of LCP when the connection is established.
Maximum Request Unit (MRU) sizes up to 1500 bytes, but the DSU/CSU will
attempt to negotiate down to 500 bytes.
The DSU/CSU provides a unique LCP magic number derived from the unit
serial number and the elapsed time.
Full negotiation of escape characters.
The DSU/CSU implementation of PPP does not support Link Quality Reports
(LQR), compression, encryption, Password Authentication Protocol (PAP) or
Challenge Handshake Authentication Protocol (CHAP).
The DSU/CSU implementation of SLIP supports a fixed MRU size of 1006 bytes.
Before selecting the protocol, you must first select the port to be used as the
communications link. Refer to
Selecting the Port
on page 3-20. This example
assumes that the COM port is being used as the communications link.
Procedure
To select the link layer protocol:
1. From the top-level menu screen, select Cnfig.
2. Select the configuration option set to be copied into the Edit area by using the
appropriate Function key. Use the scroll keys, if necessary.
3. Select Edit.
4. From the Edit screen, press the
key until the Mgmt selection appears on
the screen.
Содержание 3160-A3
Страница 16: ...About This Guide x February 2001 3160 A2 GB21 90...
Страница 24: ...1 Introduction 1 8 February 2001 3160 A2 GB21 90...
Страница 100: ...3 Operation 3 66 February 2001 3160 A2 GB21 90...
Страница 142: ...A Front Panel Menu A 2 February 2001 3160 A2 GB21 90...
Страница 198: ...C Configuration Options C 54 February 2001 3160 A2 GB21 90...
Страница 246: ...E SNMP MIB Objects E 32 February 2001 3160 A2 GB21 90...
Страница 280: ...H Asynchronous Terminal Operation H 24 February 2001 3160 A2 GB21 90...
Страница 282: ...I Equipment List I 2 February 2001 3160 A2 GB21 90...