75
Installation Manual
Step 3: Please make sure the jumper pins on Tx-2 and Rx-2.
Step 4: The inverter needs to connect the power, either choices
PV, Battery or Grid. Then use the application software setting your
parameters.
Configuring the Hardware
U
SB
p
o
rt
Tx-1
R
x-1
Tx-2
R
x-2
Tx-1
Rx-1
Tx-2
Rx-2
UBS port
Содержание EverVolt EVAC-105-6
Страница 1: ...V 01012021 Installation Service Manual FOR AC AND DC COUPLED EVERVOLT SYSTEMS ...
Страница 65: ...65 Installation Manual Operation and Display Panel ...
Страница 76: ...76 Installation Manual Configuring the Hardware PV INPUT IS ONLY USED FOR EVERVOLT DC COUPLED SYSTEM ...
Страница 83: ...83 Installation Manual Step 5 Install the Generator wire ...