Installation Manual
Operational Testing
11. OPERATIONAL TESTING
To Startup Equipment:
1) Check that cables are properly connected,
2) DC Coupled EverVolt only: Turn on Solar by commissioning Solar PV
Rapid Shutdown
3) Turn on:
a. "Main" Electrical Panel ESS breaker
b. Inverter PV Solar Switch
c. Inverter "Main AC Grid" Breaker
d. Battery Breaker (if not already on)
e. “LOAD INPUT” “FROM GRID” (connects Essential Loads directly to Grid)
4) Turn ON the Main Switch (located on the left side of the inverter)
5) If the inverter has PV (DC Coupled EverVolt Only) or GRID input, then
the system will automatically start. If only battery starts the inverter,
press the Enter button for seven seconds until two beeps are heard. The
system will boot up in under sixty seconds.
6) After three minutes, check Load Output Voltage on the inverter POWER
INFORMATION PAGE. See image below:
Test Limit L1-L2 232.8 - 247.2 VAC.
7) Turn on LOAD Breaker
8) Check PV, Battery and Load values from Power Information Page.
See Section 12, OPERATION AND DISPLAY PANEL for details on system
operation.
Содержание EverVolt EVAC-105-6
Страница 1: ...V 01012021 Installation Service Manual FOR AC AND DC COUPLED EVERVOLT SYSTEMS ...
Страница 65: ...65 Installation Manual Operation and Display Panel ...
Страница 76: ...76 Installation Manual Configuring the Hardware PV INPUT IS ONLY USED FOR EVERVOLT DC COUPLED SYSTEM ...
Страница 83: ...83 Installation Manual Step 5 Install the Generator wire ...