126
Creating Graphs
Section 4-8
4-8-2
Modifying Graphs
The contents and position of a graph created on the screen can be modified.
Reference:
When using an NT30, NT30C, NT612G, or NT610C and Ver.3 or a later version of
the direct connection function, the interval between the vertices in a broken line
graph can be changed as required during modification.
Procedure 1.
Select “GRAPH” on the initial editing screen.
The graph menu will be displayed.
"
It is also possible to proceed straight to step 4. by left clicking on the graph to be
modified (see p.57).
2.
Select the type of graph to be modified from the graph menu and press the
key.
3.
Select the graph to be modified in the window and press the
key.
"
To delete a graph that has already been set, locate the cursor at the field for that
graph and press the [F1] (Delete) key.
Batch deletion of trend graphs and broken line graphs in frame units is possible
by pressing the [F2] (All delete) key. Pressing the [F10] (Basic) key allows
modification of the basic settings.
4.
Select the required item and execute the modification.
For details on the meanings of each of the items, refer to the sections describ-
ing the creation of each of the graph types.
Broken line
graph
Trend graph
basic settings
Trend graph
Broken line graph
basic settings
Bar graph
Содержание NT - SUPPORT TOOL 07-1995
Страница 1: ...Cat No V028 E1 1 NT series Support Tool OPERATION MANUAL...
Страница 2: ...i...
Страница 3: ...ii...
Страница 4: ...iii NT series Support Tool Operation Manual Produced July 1995...
Страница 5: ...iv...
Страница 19: ...xviii...
Страница 25: ...6 IBM PC AT Preparations Section 1 2...
Страница 37: ...18 Basic Operating Procedures Section 2 2...
Страница 67: ...48 Scr list Screen Section 3 5...
Страница 177: ...158 Editing Screen Data Section 4 15...
Страница 193: ...174 Library Data Section 5 3...
Страница 201: ...182 Printing Data Section 6 1...