Date
26/6/2017
Document 923860006_09_006
Document code 923860006_09_006
Page 32 from 44
4.2.18 Function test
By pressing YES, a complete function test is conducted.
Clicking on TECHNICIAN MENU goes back to the technician menu page.
4.2.19 Capacity test
By pressing YES, a complete capacity test is conducted.
Clicking on TECHNICIAN MENU goes back to the technician menu page.
4.2.20 Programming the function test
Via this page you can program the automatic function test. In the selection TIME INTERVAL select DAILY, EVERY
OTHER DAY or one of the days of the week. Enter the time in the TIME SETTING box and press SAVE. It’s wise
to adjust the function test to take place when there are no people in the building or when there are no other active
tasks that could interfere with the automated function test.
Clicking on TECHNICIAN MENU goes back to the technician menu page.
4.2.21 Programming the capacity test
Via this page you can program the next 2 consecutive capacity tests. By default, both tests are active. To program
the capacity test, select YES in the selection ACTIVE for test 1 and test 2 (if needed). Adjust the time and date for
each test and press SAVE.
With the capacity test the system tests the batteries’ capability of sustaining the stated autonomy. The capacity test
must be done from once every 6 months to once a year. The maximum duration of the capacity test is the 2/3 of
the stated autonomous duration of the panel.
Clicking on TECHNICIAN MENU goes back to the technician menu page.