Cascade settings
109
Adjustable
Hysteresis
The setting of the
Hysteresis
refers to the boilers starting numbering. For each
starting numbers there is an individually adjustable Hysteresis.
The
Hysteresis
enables a gradual ON and turn-OFF of the boilers. See graphic.
Delay Time
The setting of the
Delay Time
refers to the starting numbers of the boilers.
Apart from the starting number 1, each starting number has a Delay Time.
At first it starts only the boiler with the starting number 1. Every other boiler
starts at the end of the Delay Time in which is checked if the boiler or the boilers
can fulfil the requirements. With the buner demand of the boiler with starting
number 1, all Delay Times starts at the same time.
Delay Temp
The setting of the
Delay Temp
refers to the starting numbers of the boiler.
Apart from the starting number 1, each starting number has a Delay Temp. If the
outside temperature is higher than the Delay Temp, there is
no
burner demand.
Cascade Base Min
The
Cascade Base Min
is the minimum requirement to the cascade. Falls the
Cascade Base
(is calculated from the set values) falls below the
Cascade Base
Min
obtains the
Cascade Base Min
. If there is no requirement, the cascade only
activates, if the frost protection function is active (8°C).
Sequence Changes
To load the boilers equally, the starting numbers of the boilers change at the
end of the time
Sequence Changes
. The time
Sequence Changes
refers to the
actual boiler run time.
Note:
With setting
0
, no Sequence Change is made! It always starts boiler No.1 at
first.
Peak Load Boiler
The
Peak Load Boiler
is actually the last boiler (the highest boiler number). It
has the highest starting number.
The
Peak Load Boiler
is excepted from the sequence change. It is only used for
managing energy peaks and always starts at last.
Operating Manual PELLEMATIC® PE(S)(K)(B) 10 — 56
Содержание PE 08
Страница 16: ...16 Wiring diagrams PE 567 EN 1 1 ...
Страница 17: ...Wiring diagrams 17 Operating Manual PELLEMATIC PE S K B 10 56 ...
Страница 18: ...18 Wiring diagrams PE 567 EN 1 1 ...
Страница 76: ...76 Code Input Menu of Pelletronic Touch after entering the code PE 567 EN 1 1 ...
Страница 110: ...110 Cascade settings Back to the menu Sys Regulation PE 567 EN 1 1 ...
Страница 168: ......
Страница 169: ......