22
Connection plan
8.2 Connection plan
The Connection plan is a description of all the electrical connections from the Pelletronic heating controller:
Only an authorised installer may install and connect the
heating controller to the power supply.
Isolate the entire heating system from the power supply
before starting work on the heating controller.
Boiler outside sensor must be connected on
the first heating controller!
Terminals extra-low voltage zone
Terminals low voltage zone - 120VAC
X1A
Bus wiring – Bus RS485
Burner demand 1 – BRanf 1
X22
X1B
Bus wiring – Bus RS485
Mixer HK1 opening – M1
X23 – 13/N
X2
Outdor sensor – AF
Mixer HK1 closing – M1
X23 – 23/N
X3
Boiler sensor – KF
Burner demand 2 – BRanf 2
(Potencial free contact)
X24
X4
Flow sensor HK1 – VL1
Mixer HK2 opening – M2
X25 – 13/N
X5
Flow sensor HK2 – VL2
Mixer HK2 closing – M2
X25 – 23/N
X6
DHW sensor – WW
Heating circuit pump – HK1
X26
X7
AC upper sensor – PO
Heating circuit pump – HK2
X27
X8
AC middle sensor – PM
Solar pump 2 – Sol P2
X28
X9
AC lower sensor 1 – SPU1
Return pump – Heat main pump – ZP
X29
X10
AC lower sensor 2 – SPU2
Domestic hot water – WW
X30
X11
Solar pump 1 A-class
Solar pump 1– Sol P1
X31
X12
Reserve – S3
Accumulator pump – PLP
X32
X13
Reserve – S2
Power supply 115V – 240V~
X33
X14
Return sensor – ZIRK
X15
Collector sensor – KOLL
X16
Solar energy Flow – VWMZ
PE 567 EN 1.1
Содержание PE 08
Страница 16: ...16 Wiring diagrams PE 567 EN 1 1 ...
Страница 17: ...Wiring diagrams 17 Operating Manual PELLEMATIC PE S K B 10 56 ...
Страница 18: ...18 Wiring diagrams PE 567 EN 1 1 ...
Страница 76: ...76 Code Input Menu of Pelletronic Touch after entering the code PE 567 EN 1 1 ...
Страница 110: ...110 Cascade settings Back to the menu Sys Regulation PE 567 EN 1 1 ...
Страница 168: ......
Страница 169: ......