6 Assembly: Bell-type tank design
Maschinenfabrik Reinhausen GmbH 2015
116
4349315/00 EN
VACUTAP® VR®
2.
Loosen screws with safety elements on the on-load tap-changer head
cover.
Figure 130: On-load tap-changer head cover
3.
NOTICE!
Remove on-load tap-changer head cover. Check that the
sealing surfaces on the on-load tap-changer head cover and on-load
tap-changer head are in sound condition when removing and during all
other work. Ensure that o-ring is in sound condition also. Damaged seal-
ing surfaces result in oil escaping and therefore on-load tap-changer
and transformer damage.
Figure 131: On-load tap-changer head cover
4.
NOTICE!
Do not expose the open oil compartment to ambient humidity
for more than 10 hours. If you do, this may result in damage to the on-
load tap-changer and transformer due to insufficient dielectric strength
of the diverter switch oil!
Содержание VACUTAP VR
Страница 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Страница 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Страница 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Страница 266: ......
Страница 267: ......