9 Commissioning of on-load tap-changer by transformer manufacturer
Maschinenfabrik Reinhausen GmbH 2015
210
4349315/00 EN
VACUTAP® VR®
Bleeding suction pipe on pipe connection S
1.
Remove screw cap from pipe connection S.
Figure 285: Screw cap
2.
Open vent screw and bleed piping.
3.
Close vent screw.
4.
Seal vent screw with screw cap.
Grounding the on-load tap-changer
1.
Connect the grounding screw on the on-load tap-changer head to the
transformer cover.
Figure 286: Head grounding screw
9.1.2
9.2
Содержание VACUTAP VR
Страница 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Страница 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Страница 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Страница 266: ......
Страница 267: ......