6 Assembly: Bell-type tank design
Maschinenfabrik Reinhausen GmbH 2015
113
4349315/00 EN
VACUTAP® VR®
Without interruption
in measured current
With interruption
(measured current = 0
A before change in
operating position)
Oil compartment filled
with insulating oil
Maximum 50 A DC
Maximum 50 A DC
Table 8: Maximum permitted measured currents when measuring DC resistance on
transformer
Drying on-load tap-changer in autoclave
Dry on-load tap-changer using the following instructions to ensure the dielec-
tric values assured by MR on the on-load tap-changer.
If you want to dry the on-load tap-changer in an autoclave, first perform the
drying process and then complete transformer assembly.
If drying in an autoclave, the following methods are possible:
▪
Vacuum-drying
▪
Vapor-phase drying
Vacuum-drying in the autoclave
Before starting vacuum-drying in the autoclave, you must remove the on-
load tap-changer head cover and on-load tap-changer accessories:
1.
NOTICE!
Remove the on-load tap-changer head cover (24 screws M10/
wrench size 17 with safety elements) and store it outside the autoclave.
If this is not done, the on-load tap-changer head cover may be dam-
aged.
2.
NOTICE!
Remove on-load tap-changer accessories and store outside
autoclave: motor-drive unit, drive shaft, protective relay, pressure moni-
toring device, pressure relief device, bevel gear, temperature sensor, oil
filter unit. If this is not done, the on-load tap-changer accessories may
be damaged.
Vacuum-drying in the autoclave
1.
Heat up the on-load tap-changer in air at atmospheric pressure with a
temperature increase of about 10 °C/h to a final temperature of maxi-
mum 110 °C.
2.
Pre-dry the on-load tap-changer in circulating air at a max. temperature
of 110 °C for a period of 20 hours.
3.
Vacuum dry on-load tap-changer at between 105 °C and maximum 125
°C for at least 50 hours.
4.
Residual pressure of no more than 10
-3
bar.
6.6
6.6.1
Содержание VACUTAP VR
Страница 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Страница 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Страница 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Страница 266: ......
Страница 267: ......