9 Commissioning of on-load tap-changer by transformer manufacturer
Maschinenfabrik Reinhausen GmbH 2015
213
4349315/00 EN
VACUTAP® VR®
Note the following points
before
undertaking high voltage tests on the trans-
former:
▪
Ensure that the ground connections on the motor-drive protective hous-
ing and protective housing fastening are free of paint.
▪
Only perform high voltage test if motor-drive unit door is closed.
▪
Disconnect external connections to electronic components in the motor-
drive unit to prevent damage from overvoltage.
▪
When connecting the motor-drive unit's supply voltage, only use the
holes in the protective housing base intended for lead insertion.
▪
Guide all ground connecting leads to one central connection point (es-
tablishment of suitable reference earth).
▪
Disconnect all electronic components before the high voltage test. Be-
fore a wiring dielectric test, remove all devices with a withstand voltage
of < 1,000 V.
▪
Leads used for testing must be removed before the high voltage test, as
these function as antennas.
▪
Wherever possible, route the measurement and data leads separately
from the energy cables.
Contact the manufacturer if you have any questions about possible sources
of danger.
Содержание VACUTAP VR
Страница 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Страница 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Страница 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Страница 266: ......
Страница 267: ......