6 Assembly: Bell-type tank design
Maschinenfabrik Reinhausen GmbH 2015
138
4349315/00 EN
VACUTAP® VR®
The kerosene drain plug is located in the oil compartment base and is not
generally accessible from the outside. For this reason, you first have to re-
move the diverter switch insert, open the kerosene drain plug, and then in-
stall the diverter switch insert again. After the drying process, you have to re-
move the diverter switch insert again to close the kerosene drain plug.
NOTICE
Damage to the on-load tap-changer!
Damage to the on-load tap-changer and oil suction pipe due to incorrect or-
der of installation.
► Strictly adhere to the order of installation. Make sure to always install
the diverter switch insert before inserting the oil suction pipe into the oil
compartment.
Removing diverter switch insert
Before you can remove the diverter switch insert, you have to move the on-
load tap-changer into the adjustment position and remove the on-load tap-
changer head cover, tap position indicator, and oil suction pipe.
Before you can remove the diverter switch insert, you have to move the on-
load tap-changer into the adjustment position and remove the on-load tap-
changer head cover, tap position indicator, tap-change supervisory control,
and oil suction pipe.
Moving on-load tap-changer to adjustment position
► Move on-load tap-changer to adjustment position.
Figure 172: Adjustment position
6.9.2.1
6.9.2.1.1
Содержание VACUTAP VR
Страница 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Страница 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Страница 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Страница 266: ......
Страница 267: ......