11 Commissioning transformer at installation site
Maschinenfabrik Reinhausen GmbH 2015
221
4349315/00 EN
VACUTAP® VR®
2.
Fill on-load tap-changer with new mineral insulating oil for transformers
in accordance with IEC 60296 using one of the two free pipe connec-
tions of the on-load tap-changer head.
Figure 290: Pipe connection S and R
3.
Take oil sample from oil compartment.
4.
Record temperature of oil sample just after sample is taken.
5.
Determine dielectric strength and water content at a diverter switch oil
temperature of 20 °C ± 5 °C. The dielectric strength and water content
must comply with the limit values provided in the appendix [
6.
Bleed the on-load tap-changer.
7.
Carry out tap change operation tests.
Commissioning the transformer
1.
Loop the signaling contact for falling below the minimum oil level in the
on-load tap-changer's oil conservator into the tripping circuit of the cir-
cuit breaker.
2.
Loop protective relay and additional protective devices (e.g. pressure re-
lief device) into circuit breaker's tripping circuit.
3.
Ensure that all stop-cocks between on-load tap-changer and oil conser-
vator of the on-load tap-changer are open.
11.5
Содержание VACUTAP VR
Страница 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Страница 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Страница 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Страница 266: ......
Страница 267: ......