The Slave BALTO system hasn’t finished the start-up procedure yet. Disconnect the cable between the two BALTO
Modular systems and start them up properly.
All the tests are blocked.
It is recommended to have an identical amount of Power Units on both the Master and the Slave system. A maximum
deviation of one Power unit between both systems is allowed. If the difference is more than one Power Unit, all tests
will be blocked.
A difference of 1 Power Unit is allowed, for example:
Master 3 - Slave 2
Master 3 - Slave 4
However, use of an asymmetrical amount of Power Units may have an effect on the lifetime of the batteries.
www.megger.com
102
Master/Slave version.