
333
9. Hang wire rope for lifting on the No. 1 Fly-jib (2) and sling it
temporarily.
10. Pull out the linchpins of the position pins (C1, C2) and draw
out the position pins (C1, C2).
11. Operate the crane and lift the No. 1 Fly-jib (2) to remove.
12. Loosen the nut (53) of the Fly-jib stowage bracket A (21) and turn the adjusting bolt (52)
counterclockwise to loosen.
13. Remove the Fly-jib stowage bracket A (21) from the main boom (1) by unscrewing 4 mounting bolts
(54).
14. Disconnect the wiring connector (55) of the Fly-jib stowage detection limit switch at the side of the
Fly-jib stowage bracket B (22).
15. Remove the Fly-jib stowage bracket B (22) from the main boom (1) by unscrewing 4 mounting bolts
(56).
Содержание CC1485S-1
Страница 2: ......
Страница 57: ...49 SAFETY LABEL LOCATIONS OUTSIDE OF THE CABIN...
Страница 58: ...50 SAFETY LABEL LOCATIONS IN THE ENGINE ROOM...
Страница 59: ...51 1 Safe operation 557 3494500 2 Working range diagram 585 2236900...
Страница 82: ...74...
Страница 232: ...224 This Page Intentionally Left Blank...
Страница 267: ...259...
Страница 302: ...294 This Page Intentionally Left Blank...
Страница 305: ...297 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 309: ...301 4 WORKING RADIUS LIFTING HEIGHT...
Страница 310: ...302 This Page Intentionally Left Blank...
Страница 363: ...355 9 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 365: ...357 9 4 WORKING RADIUS LIFTING HEIGHT 9 4 1 WORKING RADIUS LIFTING HEIGHT WHEN FLY JIB ANGLE IS 0 DEGREES AND 20 DEGREES...
Страница 366: ...358 9 4 2 WORKING RADIUS LIFTING HEIGHT WHEN FLY JIB ANGLE IS 40 DEGREES AND 60 DEGREES...
Страница 368: ......
Страница 369: ......
Страница 370: ......