
171
4. Operate the right work equipment operation lever (3) to
"RAISE" side (pull toward you) to raise the boom.
NOTES
At this time, be careful not to allow the hook block (4) and
rope for stowage (5) to be overtightened. If the rope for
stowage (5) is overtightened, lower the hook block (4).
5. Repeat the operation in Section 3 and 4 and slowly raise
the boom until the hook block (4) is placed at the position
where it is perpendicular to the stowage section in the front
of the revolving super structure.
If the hook block (4) is removed from the rope for
stowage (5) without the boom being raised to near the
stowage position, the hook block (4) sways
considerably, which may not only damage to the
peripheral equipment but also cause serious physical
injury.
6. Remove the hook block (4) from the rope for stowage (5).
7. Securely hitch the rope for stowage (5) on the rope hook
(6).
Содержание CC1485S-1
Страница 2: ......
Страница 57: ...49 SAFETY LABEL LOCATIONS OUTSIDE OF THE CABIN...
Страница 58: ...50 SAFETY LABEL LOCATIONS IN THE ENGINE ROOM...
Страница 59: ...51 1 Safe operation 557 3494500 2 Working range diagram 585 2236900...
Страница 82: ...74...
Страница 232: ...224 This Page Intentionally Left Blank...
Страница 267: ...259...
Страница 302: ...294 This Page Intentionally Left Blank...
Страница 305: ...297 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 309: ...301 4 WORKING RADIUS LIFTING HEIGHT...
Страница 310: ...302 This Page Intentionally Left Blank...
Страница 363: ...355 9 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 365: ...357 9 4 WORKING RADIUS LIFTING HEIGHT 9 4 1 WORKING RADIUS LIFTING HEIGHT WHEN FLY JIB ANGLE IS 0 DEGREES AND 20 DEGREES...
Страница 366: ...358 9 4 2 WORKING RADIUS LIFTING HEIGHT WHEN FLY JIB ANGLE IS 40 DEGREES AND 60 DEGREES...
Страница 368: ......
Страница 369: ......
Страница 370: ......