
241
10. MAINTENANCE PROCEDURE
10.1 INITIAL 500 HOUR MAINTENANCE
The following maintenance should be performed after 500hours of operation for the 1st
maintenance servicing only, of a new machine.
[1] OIL REPLACEMENT IN WINCH REDUCTION GEAR CASE
See "10.7 MAINTENANCE EVERY 1000 HOURS " for maintenance places and procedure.
10.2 PRE-OPERATION INSPECTION
Inspections described in this section should be conducted before the first engine start-up of the
day.
See “9. LIST OF ITEMS FOR INSPECTION AND MAINTENANCE” for the items of pre-operation
inspection.
See "OPERATION 3.1 PRE-OPERATION INSPECTION" for maintenance places and procedure
of pre-operation inspection.
Содержание CC1485S-1
Страница 2: ......
Страница 57: ...49 SAFETY LABEL LOCATIONS OUTSIDE OF THE CABIN...
Страница 58: ...50 SAFETY LABEL LOCATIONS IN THE ENGINE ROOM...
Страница 59: ...51 1 Safe operation 557 3494500 2 Working range diagram 585 2236900...
Страница 82: ...74...
Страница 232: ...224 This Page Intentionally Left Blank...
Страница 267: ...259...
Страница 302: ...294 This Page Intentionally Left Blank...
Страница 305: ...297 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 309: ...301 4 WORKING RADIUS LIFTING HEIGHT...
Страница 310: ...302 This Page Intentionally Left Blank...
Страница 363: ...355 9 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 365: ...357 9 4 WORKING RADIUS LIFTING HEIGHT 9 4 1 WORKING RADIUS LIFTING HEIGHT WHEN FLY JIB ANGLE IS 0 DEGREES AND 20 DEGREES...
Страница 366: ...358 9 4 2 WORKING RADIUS LIFTING HEIGHT WHEN FLY JIB ANGLE IS 40 DEGREES AND 60 DEGREES...
Страница 368: ......
Страница 369: ......
Страница 370: ......