
155
7. Slowly operate the left work equipment operation lever (4)
to the stroke end on the "Extend" side (push forward) and
after the boom completely extends, hold the lever at that
position for 30 seconds.
At this time, operate the right work equipment operation
lever (3) to the "Wind down" side (push forward) as
necessary so that the hook is not overwound.
8. Slowly operate the left work equipment operation lever (4)
to the stroke end on the "Retract" side (pull backward) and
after the boom completely retracts, hold the lever at that
position for 30 seconds.
At this time, operate the right work equipment operation
lever (3) to the "Wind up" side (pull backward) as necessary
so that the hook does not contact the ground.
9. Repeat the operation from the procedure 7 to the procedure
10 for 5 minutes.
10. In cold climate, further repeat the operation from the
procedure 7 to the procedure 10 as necessary.
Содержание CC1485S-1
Страница 2: ......
Страница 57: ...49 SAFETY LABEL LOCATIONS OUTSIDE OF THE CABIN...
Страница 58: ...50 SAFETY LABEL LOCATIONS IN THE ENGINE ROOM...
Страница 59: ...51 1 Safe operation 557 3494500 2 Working range diagram 585 2236900...
Страница 82: ...74...
Страница 232: ...224 This Page Intentionally Left Blank...
Страница 267: ...259...
Страница 302: ...294 This Page Intentionally Left Blank...
Страница 305: ...297 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 309: ...301 4 WORKING RADIUS LIFTING HEIGHT...
Страница 310: ...302 This Page Intentionally Left Blank...
Страница 363: ...355 9 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 365: ...357 9 4 WORKING RADIUS LIFTING HEIGHT 9 4 1 WORKING RADIUS LIFTING HEIGHT WHEN FLY JIB ANGLE IS 0 DEGREES AND 20 DEGREES...
Страница 366: ...358 9 4 2 WORKING RADIUS LIFTING HEIGHT WHEN FLY JIB ANGLE IS 40 DEGREES AND 60 DEGREES...
Страница 368: ......
Страница 369: ......
Страница 370: ......