Lucent Technologies Lineage
®
2000 100A Ferroresonant Rectifier J85503A-1
6 - 12 Testing
Issue 6 October 1998
2. If the rectifier is in a microprocessor-controlled plant with
an efficiency algorithm feature, disable this feature. (See
the controller manual for instructions.)
3. At the ac service panel supplying power to the rectifier,
insert the input fuses assigned to the rectifier or turn the
circuit breaker On.
4. To bring the rectifier into service,
a. Turn the rectifier Power switch On. The green Power
LED must light. Wait 10 seconds.
Table 6-C: Rectifier Control Settings Prior to
Testing On Line
Controls
Position/Status
Associated ac circuit breaker
or fuses at the ac service
distribution panel
Off or fuses removed and
holders tagged “Out of
Service”
Rectifier Power switch
Off (down)
Rectifier DC Output circuit
breaker
Off (down)
Output Volts Adj
potentiometer
Fully counterclockwise
Associated REG fuse in
plant controller
Removed
Warning
DO NOT turn on the DC Output circuit breaker without first
turning the rectifier On, then Off.
Note
If the rectifier continues to operate, proceed to Step b. If
the rectifier shuts down due to initial high voltage, monitor the
Rect V voltage. When this reading reaches 26 volts for
24-volt plants, or 52 volts for 48-volt plants, turn on the
circuit breaker. If the rectifier shuts down for any other
reason, such as component failure, see Section 7,
Troubleshooting and Adjustments.