2
2
2
F
R
3
3
P
b
R
T
1
2
3
2 PREPAR
2.1 Use 10 to
2.2 Fit slings
Front of engin
Rear of engin
3 FRONT
3.1 Secure th
Protect from f
by using padd
RESOURCES:
The end of th
. End of slin
2. Shackle
3. Hook
RATION
on crane and
in place.
ne 1,970 mm
ne 2.300 mm
OF ENGIN
he end of the
friction
ding
: EQUIPMENT
he front sling
g
PRO
IM-
beams with
m in total
m in total
NE
e front sling to
T & PROCES
comprises:
ODUCT INFORMA
-G-C-00-0
LIFTING
1,400 mm s
o the eyebolt
SES
ATION
004e
G SYSTEM
separation be
t
INDEX
A
FOR SFG
etween cente
Mar
GLD/SFGM
ers.
1
2
3
DATE
rch 2016
M V ENGIN
Dep. 8
NE
2//5
3.1.2
O&M_2.002211.810_A_10_2016