4
4
4
4
4.3 So each s
4.4 Attach the
4.5
4.6 Connect b
when tens
CA
sling is direct
e end of the
both ends of
sion is create
AREFUL
PRO
IM-
ted toward e
sling to the p
Exercise ca
f the slings w
ed on lifting.
ODUCT INFORMA
-G-C-00-0
LIFTING
each side of t
preassemble
aution with th
with a shackle
ATION
004e
G SYSTEM
the engine.
ed fork and h
he recirculati
e as per the
INDEX
A
FOR SFG
ook.
on hoses
image on the
Mar
GLD/SFGM
e right, so bo
DATE
rch 2016
M V ENGIN
oth slings are
Dep. 8
NE
4/
e joined
/5
3.1.4
O&M_2.002211.810_A_10_2016