PRODUCT INFORMATION
INDEX
DATE
Dep. 2
IO-G-M-00-061e C
January 2016
MAINTENANCE OF NATURAL GAS ENGINE
SFGLD 1800 RPM PRIME
2/7
1.1. Basic maintenance operations:
NEW ENGINE OR MAJOR SERVICE WORK START-UP MAINTENANCE
Jobs to be done during the initial start-up of a new engine or during the break-in phases following major overhauls (change
of cylinder liners, pistons, piston rings, cylinder heads,...). They must be carried out by
KOHLER
authorized Repair Shop.
Job Interval
Job
Description
NA 0
h
(Operation before starting up the engine)
- General inspection and set-up of the engine
N1 100
h
(Operations after starting up or break-in phase)
- Change oil
KOHLER
MOTOROIL (oil sump and cooler)
- Change oil filters
- Analyze waste oil
- Clean the oil centrifuge filter and change
the paper filter
- Inspection of the gas ramp filter
- Adjustment of rocker arms and valve lifters. Measure valve height
- Check air/fuel ratio
- Adjust air/fuel ratio to full load, if necessary
- Measure the exhaust back-pressure
- Check damper temperature
- Inspect for leaks in all coolant, oil, gas and exhaust gases system
- Check the cleaning of carburetion system and admission (compressor, intercooler
and inlet manifold)
- Inspection and retightening of flanges and clamps, battery terminals, connectors,
flexible couplings, air filter supports, exhaust piping, oil pipes, etc.
5.1.6
O&M_2.002211.810_A_10_2016