40
Operation
5.4 Shutting down
Always shut down properly when work is complete:
•
Remove the wheel from the balancer.
•
Remove the cones from the stub shaft. Check
the surfaces (internal and external) of the cones
for damage. The conditions of the cone are very
important for a good balance quality.
•
Place the cones and the quick nut in the correct
position.
•
Check the thread of the quick nut and stub shaft.
•
Clean all threads with a dry, soft cloth.
•
Unplug the mains cable from the power outlet.
•
Check the power cable for damage or wear.
•
Tidy up the storage areas.
•
Clean the display and the input panel with a soft,
dry cloth.
•
Remove old wheel weights and any other material
from under the balancer. Make sure the balancer
rests on its three feet only.
5.4.1 Removal of the wheel
•
Carefully loosen the quick nut or the mounting
studs.
•
Do not slide the rim on the threading, but lift the
wheel when removing it.
•
Check the thread for damage and clean if necessary.
..
Содержание B 200
Страница 1: ...B200 Operator s Manual Manuel d Utilisation Manual del Operador ...
Страница 116: ...116 Blank Page ...
Страница 126: ...126 Blank Page ...
Страница 127: ...127 Blank Page ...