4 Preparations for Power-On Commissioning
Issue 02 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
23
Step 2
Understand the connections of the management system by referring to the monitoring device
networking diagram.
Step 3
Understand the initial configurations of the management system by referring to the
management system initial configuration table.
The passwords and parameters must be the same as those in the initial configuration
parameter manual for the solution in use.
----End
4.7 Preparing for the Fire Extinguishing System Power-On
Commissioning
Prerequisites
The FusionModule1000 has been installed.
Preparations
Tools: none
Documents: fire extinguishing device layout diagram, fire extinguishing system conceptual
diagram
Skill requirement: fire engineer
For the diagrams and tables, see the initial configuration parameter manual for the solution in
use.
Procedure
Step 1
Understand the layout of fire extinguishing devices by referring to the fire extinguishing
device layout diagram.
Step 2
Understand the running of the fire extinguishing system by referring to the fire extinguishing
system conceptual diagram.
----End