FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
5 Check Before Power-On
Issue 02 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
27
System
Check Item
Operation Method
Reference
smart cooling products.
drainpipe are properly
installed, and the thermal
insulation layers are
intact.
Management
system
Component
installation and
connection
Check the monitoring
device installation and
connection.
Devices are installed
securely as shown in
the monitoring device
layout diagram.
Cables are correctly
connected.
Fire
extinguishing
system
(Standard)
Device
installation and
cable
connections
Check the fire
extinguishing device
installation and cable
connections.
The pressure pointer
of the fire cylinder is
in the green zone.
The dowel of the fire
cylinder is properly
installed and intact.
All cables are
correctly and securely
connected.
Fire
extinguishing
system (CE)
Device
installation and
cable
connections
Check the fire
extinguishing device
installation and cable
connections.
The pressure pointer
of the fire cylinder is
in the green zone.
The dowel of the fire
cylinder is properly
installed and intact.
All cables are
correctly and securely
connected.
Lighting system Component
installation and
connection
Check the lighting device
installation and
connection.
Devices are installed
in positions shown in
the lighting device
layout diagram.
Cables are correctly
connected.